Ocean Zone Map

The working depth of the first coastal strip is considered to be up to 300 meters from the shore. This does not mean uniform planting across the entire area: the territory is divided into zones with different purposes, different water levels, and different planting densities.

DREVO Coastal Green Corridor

Working depth

Up to 300 m from the shore, but not the same everywhere

The initial plan assumes a working depth of up to 300 meters from the ocean. This strip is needed for primary protection, sand stabilization, and the development of soil, a grass layer, and biomass. However, within this strip, everything cannot be planted equally: closer to the ocean, salt and aerosols are stronger, while further away, soil formation, a forage layer, and softer species become possible.

DREVO Coastal Green Corridor

The zones should read as a gradient: oceanic stress gradually gives way to soil and productivity.

DREVO Coastal Green Corridor

Five-zone logic helps to avoid mixing up protective, soil and productive tasks.

DREVO Coastal Green Corridor

Micro-relief and repeating stripes allow the system to be launched in sections rather than the entire area at once.

Five belts of the first strip

ZoneDistance from the oceanThe main task
10-30 msurvive salt, spray, and sea spray
230-80 mstop the sand and start the living cover
380-150 minitiate soil formation
4150-300 mprovide biomass, fodder and soil strengthening
5locally in the shade or behind a barrierPlace edible and more tender herbs only in protected areas

The fifth zone in this scheme is not a continuous strip. It consists of protected areas within the system: shade, barrier, improved soil, and controlled water.

Unified table of herbs by zones

For a start, it's not the most "pretty" species that matter, but rather those that fit their respective zones. The first row should be able to withstand salt, the second should hold sand, the third should create soil, the fourth should provide mass and fodder, and more delicate crops should only be allowed after protection.

LineTypesRole in the system
First lineSesuvium portulacastrum, Aeluropus littoralis, Paspalum vaginatum, Carpobrotus edulissalt-resistant coating and ocean protection
Second lineCynodon dactylon, Sporobolus spicatus, Cenchrus ciliarissand stabilization and starting grass cover
Third linePanicum turgidum, Lasiurus scindicus, Medicago sativatransition to soil, forage mass and a more sustainable environment
Fourth lineChrysopogon zizanioides, Sorghum bicolor, Pennisetum glaucumbiomass, feed, root stabilization and surface protection

Area 3 km and 5 km

If the strip is 300 meters deep, then a 3-kilometer section will cover approximately 90 hectares of total area, and a 5-kilometer section will cover approximately 150 hectares. However, the first phase doesn't require launching everything at once. It's more realistic to include only a portion of the area in zones to check the geometry, water, views, and maintenance.

ScaleTotal areaIt's really possible to launch it in the first stage.Meaning
3 km900,000 m² / 90 hectaresabout 225,000 m² / 22.5 hectaresChecking the logic of the 4 main zones
5 km1,500,000 m² / 150 haabout 375,000 m² / 37.5 hectaresan extended pilot with visible infrastructure logic

Calculation by zones for the first stage

ZoneTotal area of ​​3 kmLaunch at 3 kmTotal area of ​​5 km5 km launch
190,000 m²45,000 m²150,000 m²75,000 m²
2150,000 m²60,000 m²250,000 m²100,000 m²
3210,000 m²52,500 m²350,000 m²87,500 m²
4450,000 m²67,500 m²750,000 m²112,500 m²

This calculation demonstrates to the investor and the team that the project does not require the simultaneous launch of all 90-150 hectares. The first phase should be manageable.

Logic on water

For 3-5 km, it's impossible to rely on continuous irrigation of the entire area. Water should be distributed along a gradient: closer to the ocean, only the initial launch and survival phase is needed, further away, only the first season's support, and it's wiser to concentrate the main controlled water supply in more protected productive zones.

Zone 1
almost no watering, only starting support
Zone 2
rare initial watering to establish the cover
Zone 3
first season support and soil control
Zone 4
the main place of controlled irrigation and productive biomass

Format for implementation

The most realistic format: a 500-meter pilot with a depth of 150-300 meters, then a 1-kilometer pilot, then scaling up to 3 km, and after testing, to 5 km. This way, the project is presented not as an abstract idea, but as a step-by-step engineering and biological program.

Brief conclusion: for a 3-km strip, a 300-meter-deep strip yields approximately 90 hectares, for a 5-km strip, approximately 150 hectares. However, the first phase should cover approximately 22.5 hectares for a 3-km strip and 37.5 hectares for a 5-km strip.